A basement in Dubai sits close to groundwater, so its waterproofing has to be right the first time. Once the raft is cast over it, there is no second chance.
On our featured villa project our crews took the basement through horizontal and vertical waterproofing: priming, torching the membrane across the floor and up the walls, lining every pit, and protecting it before steel and concrete went on top.

What our crews do
- Primer and torch-applied bituminous membranes on basement floors
- Vertical membranes on retaining and lining walls
- Sump and lift pits fully lined, corners and junctions detailed
- Protection boards and screed over the finished membrane
How we keep it right
- Clean, dry, level substrate before any membrane is laid
- Overlaps sealed to the specified width and checked lap by lap
- Corners, pits and penetrations reinforced and detailed by hand
- Membrane protected before the next trade, and kept for inspection
On site: our featured villa project





Photos from the weekly site reports of our featured current project, a basement villa (B+G+1+R) in Dubai.
Waterproofing in our villa build log
Site updates from our featured villa project in Dubai, showing this work stage by stage.

Keeping the water out
Wellpoints and pumps hold the groundwater below the dig.

Going down: bulk excavation
Sand out by the truckload, panels in as the dig gets deeper.

Shoring goes in, the dig begins
Steel beams around the plot, then precast panels as we go down.
More of our works
- Blockwork Basement lining walls, pits and internal partitions, built straight, plumb and bonded.
- Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
- Shutter work Formwork for columns, walls and slabs: true, braced and tight, and stripped cleanly.
- Columns & core walls Tall columns and core walls formed, braced and poured by boom pump, with starter bars set for the floor above.
- PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
- Post-tensioned slabs Deck, mesh and tendon ducts set out to the specialist’s profiles and protected through the pour.
- Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
- Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.