SYMJORACONTRACTING

A basement in Dubai sits close to groundwater, so its waterproofing has to be right the first time. Once the raft is cast over it, there is no second chance.

On our featured villa project our crews took the basement through horizontal and vertical waterproofing: priming, torching the membrane across the floor and up the walls, lining every pit, and protecting it before steel and concrete went on top.

Crew rolling out bituminous membrane across a basement floor
The crew laying membrane across the basement floor, each roll aligned to its neighbour before torching.

What our crews do

  • Primer and torch-applied bituminous membranes on basement floors
  • Vertical membranes on retaining and lining walls
  • Sump and lift pits fully lined, corners and junctions detailed
  • Protection boards and screed over the finished membrane

How we keep it right

  • Clean, dry, level substrate before any membrane is laid
  • Overlaps sealed to the specified width and checked lap by lap
  • Corners, pits and penetrations reinforced and detailed by hand
  • Membrane protected before the next trade, and kept for inspection

Photos from the weekly site reports of our featured current project, a basement villa (B+G+1+R) in Dubai.

Waterproofing in our villa build log

Site updates from our featured villa project in Dubai, showing this work stage by stage.

See the full villa build log →

More of our works

  • Blockwork Basement lining walls, pits and internal partitions, built straight, plumb and bonded.
  • Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
  • Shutter work Formwork for columns, walls and slabs: true, braced and tight, and stripped cleanly.
  • Columns & core walls Tall columns and core walls formed, braced and poured by boom pump, with starter bars set for the floor above.
  • PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
  • Post-tensioned slabs Deck, mesh and tendon ducts set out to the specialist’s profiles and protected through the pour.
  • Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
  • Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.