Site update 2

Shoring goes in, the dig begins

Overview: excavators, panels and site cabins, on our featured villa project in Dubai (build log update 2).
Overview: excavators, panels and site cabins.

You can't dig a basement in sand without holding the sides first.

With the plot ready, steel H-beams went in around the whole plot. As the excavators dig down, precast concrete panels slot in between the beams to hold the sand back.

Dubai's ground is mostly loose sand, and a vertical cut in sand doesn't stand up on its own for long. For a basement next to a road and neighbouring plots, the excavation can't simply be battered back at a slope either, because there isn't the room. That's what the shoring system is for.

The steel H-beams are installed first along the line of the basement walls. Then the excavation goes down in stages, and at each stage precast concrete panels are slotted in between the flanges of the beams. The panels follow the dig, so the open face of sand is only ever exposed for a short time.

Why it matters

Shoring is temporary, but it's what makes a deep basement possible next to roads and neighbours. Getting the beam positions right on day one saves weeks later.

Our crews on this stage

See the villa civil and finishing works our crews carry out in Dubai.

On site

What comes next

Site update 3: Going down: bulk excavation. Sand out by the truckload, panels in as the dig gets deeper.