Columns and core walls carry the floors above, so they have to come out plumb, solid and in exactly the right place. That depends on forms that are braced well enough to hold a full-height pour without moving.

On our featured villa project in Dubai our crews formed the tall columns and core walls in timber, braced and propped them off the slab, and poured them by boom pump with the starter bars left standing for the next floor.

Boom pump over braced timber column and wall forms on a villa slab
Timber forms braced and propped off the slab, with the boom pump in position for the pour.

What our crews do

  • Timber column and core-wall forms, full height
  • Raking props and bracing off the slab
  • Form platforms for placing and compacting concrete
  • Boom-pump pours with starter bars set for the floor above

How we keep it right

  • Every form plumbed, braced and checked before the pour
  • Concrete placed in lifts and compacted from the platform
  • Starter bars kept clean, straight and in position
  • Forms struck and cleared once the concrete has gained strength

Photos from the weekly site reports of our featured current project, a basement villa (B+G+1+R) in Dubai.

Columns & core walls in our villa build log

Site updates from our featured villa project in Dubai, showing this work stage by stage.

See the full villa build log →

More of our works

  • Blockwork Basement lining walls, pits and internal partitions, built straight, plumb and bonded.
  • Waterproofing Torch-applied membranes for basement floors, walls and pits, with every lap sealed.
  • Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
  • Shutter work Formwork for columns, walls and slabs: true, braced and tight, and stripped cleanly.
  • PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
  • Post-tensioned slabs Deck, mesh and tendon ducts set out to the specialist’s profiles and protected through the pour.
  • Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
  • Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.