Good blockwork is invisible once it is plastered, and that is the point. Walls that go up straight, plumb and properly bonded save time and material at every trade that follows.
On our featured villa project our crews built the blockwork lining to the basement excavation, the walls of the sump and lift pits, and, after the ground-floor structure, the internal partitions that define each room.

What our crews do
- Hollow and solid concrete block walls, load-bearing and non-load-bearing
- Basement lining walls and protection walls for waterproofing
- Sump, lift and inspection pit walls
- Internal partitions, openings, lintels and sleeves set out to drawings
How we keep it right
- Setting out checked against drawings and gridlines before the first course
- Lines and levels kept course by course, with joints filled and bonded
- Openings, sleeves and services coordinated before walls close
- Clean, consistent faces so plaster goes on at an even thickness
On site: our featured villa project





Photos from the weekly site reports of our featured current project, a basement villa (B+G+1+R) in Dubai.
Blockwork in our villa build log
Site updates from our featured villa project in Dubai, showing this work stage by stage.

Keeping the water out
Wellpoints and pumps hold the groundwater below the dig.

Going down: bulk excavation
Sand out by the truckload, panels in as the dig gets deeper.

Shoring goes in, the dig begins
Steel beams around the plot, then precast panels as we go down.
More of our works
- Waterproofing Torch-applied membranes for basement floors, walls and pits, with every lap sealed.
- Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
- Shutter work Formwork for columns, walls and slabs: true, braced and tight, and stripped cleanly.
- Columns & core walls Tall columns and core walls formed, braced and poured by boom pump, with starter bars set for the floor above.
- PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
- Post-tensioned slabs Deck, mesh and tendon ducts set out to the specialist’s profiles and protected through the pour.
- Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
- Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.