The concrete takes the shape of its formwork, every line and every flaw. Accurate, well-braced shuttering is the difference between a frame that needs patching and one that is ready for the next trade.
On our featured villa project our crews shuttered the columns, retaining and core walls, the ramp and the ground- and first-floor slabs, then struck and cleared each element after curing.

What our crews do
- Column shutters, plumbed and clamped
- Retaining, core and shear wall formwork with ties and bracing
- Slab and beam decks on props and scaffold systems
- Edge forms, openings and de-shuttering after curing
How we keep it right
- Set out to gridlines and levels, then plumb and line checked
- Joints tight and faces clean and oiled for a good finish
- Props and bracing sized and spaced for the pour
- Struck at the right time and materials cleared for the next lift
On site: our featured villa project





Photos from the weekly site reports of our featured current project, a basement villa (B+G+1+R) in Dubai.
Shutter work in our villa build log
Site updates from our featured villa project in Dubai, showing this work stage by stage.

Keeping the water out
Wellpoints and pumps hold the groundwater below the dig.

Going down: bulk excavation
Sand out by the truckload, panels in as the dig gets deeper.

Shoring goes in, the dig begins
Steel beams around the plot, then precast panels as we go down.
More of our works
- Blockwork Basement lining walls, pits and internal partitions, built straight, plumb and bonded.
- Waterproofing Torch-applied membranes for basement floors, walls and pits, with every lap sealed.
- Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
- Columns & core walls Tall columns and core walls formed, braced and poured by boom pump, with starter bars set for the floor above.
- PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
- Post-tensioned slabs Deck, mesh and tendon ducts set out to the specialist’s profiles and protected through the pour.
- Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
- Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.