Post-tensioned slabs let villas have longer spans and thinner floors, but only when every duct sits at the height the design asks for. A duct a few centimetres out changes how the slab carries its load.
On our villa projects in Dubai our crews prepare the deck and reinforcement, support the tendon ducts on chairs to the PT specialist’s profiles, keep them protected through the pour, and coordinate the stressing with the specialist.

What our crews do
- Slab deck and edge forms
- Bottom and top mesh around the ducts
- Tendon ducts on chairs to the profile drawings
- Anchor zones, bursting steel and protection through the pour
How we keep it right
- Duct heights checked against the profile drawing
- Chairs secure and ducts undamaged before concrete
- Anchor plates square to the slab edge
- Clear paths for the concrete and edge forms tight and level
On site: our villa projects in Dubai






Photos from our villa projects in Dubai.
Post-tensioned slabs in our villa build log
Site updates from our featured villa project in Dubai, showing this work stage by stage.

Keeping the water out
Wellpoints and pumps hold the groundwater below the dig.

Going down: bulk excavation
Sand out by the truckload, panels in as the dig gets deeper.

Shoring goes in, the dig begins
Steel beams around the plot, then precast panels as we go down.
More of our works
- Blockwork Basement lining walls, pits and internal partitions, built straight, plumb and bonded.
- Waterproofing Torch-applied membranes for basement floors, walls and pits, with every lap sealed.
- Steel work Reinforcement for rafts, walls, columns and slabs, fixed to bar schedules and inspected.
- Shutter work Formwork for columns, walls and slabs: true, braced and tight, and stripped cleanly.
- Columns & core walls Tall columns and core walls formed, braced and poured by boom pump, with starter bars set for the floor above.
- PCC Plain cement concrete blinding laid level, giving waterproofing and steel a sound base.
- Gypsum ceilings False ceilings, bulkheads, coves and external soffits, framed level and finished clean.
- Tiling Wall and floor tiles, large-format porcelain and external paving, set out true with even joints.