Site update 4
Keeping the water out

Dig deep enough in Dubai and you hit water. Here is how we keep it out.
Rows of wellpoints go into gravel trenches along the walls, joined by hoses to header pipes and pumps. They run day and night so the bottom of the dig stays dry enough to build on.
In much of Dubai the groundwater sits only a few metres below the surface, so a basement dig reaches it well before formation level. Water seeping into the base of a sand excavation softens it and can carry sand out from behind the shoring, so it has to be lowered before the last stage of the dig.
A wellpoint system does that. Small-diameter risers are jetted into the ground along the walls, set in gravel so they draw water without drawing sand. Each one is connected by a hose to a header pipe, and the header runs to the pumps. With the system running, the water table drops below the bottom of the excavation and the floor of the dig stays workable.
Why it matters
Dewatering isn't glamorous, but a basement is only as good as the dry ground it's built on. The pumps keep running until the structure is heavy enough to stay put.
Our crews on this stage
See the villa civil and finishing works our crews carry out in Dubai.
On site




What comes next
Site update 5: Bottom of the dig, coming soon. Levelled, compacted and set out for the foundations.