Day one: an empty plot

The empty plot, day one, on our featured villa project in Dubai (build log update 1).
The empty plot, day one.

Every villa starts as sand. This one too.

We're posting our featured villa project in Dubai stage by stage, from the empty plot to today. Week one: hoarding around the plot, the gate in, and the site set up, ready for the shoring.

The villa is a basement villa (B+G+1+R): a basement, ground floor, first floor and roof. A basement changes how a villa build starts. Before the first bucket of sand can come out, the sides of the excavation need a temporary retaining system, so the shoring has to be ready to go in first.

So the first weeks are about getting the plot ready. The hoarding panels went up on frames bolted to concrete blocks, the gate went in so trucks and plant could get in and out safely, small footings were cast for the site set-up, and the fenced plot was levelled. None of it is permanent, but it is what lets the real work start on time.

Why it matters

Before anything is dug, a basement villa needs its shoring planned and the site secured. The quiet weeks at the start set the pace for everything after.

Our crews on this stage

See the villa civil and finishing works our crews carry out in Dubai.

On site

What comes next

Site update 2: Shoring goes in, the dig begins. Steel beams around the plot, then precast panels as we go down.